TMWA Mt. Rose Water Treatment Plant – Washoe County, NV

The Mt. Rose Water Treatment Plant project consists of the construction of a 4 million gallon per day surface water treatment plant and instream diversion and their related facilities. The treatment process will be a packaged conventional filtration treatment system, ultraviolet disinfection, and sodium hypochlorite disinfection. The new WTP finish water will be conveyed in a new 14-inch transmission main and connect in to an existing 14-inch main approximately 3300 LF to the west. CME provided geotechnical engineering services prior to construction and is currently providing geotechnical engineering consultation, project special inspection and materials testing services for grading/soils stabilization, buildings and architectural systems, concrete, roadway surfacing, and other systems as required. This project has an anticipated completion date of late 2020.